I have been using SKM for power system studies for 12 years to perform short circuit, protective device coordination and arc flash studies. I report with the SKM output files will be provided after the completion of the project. All the information (including breaker, cable, transformer, motor- manufacturer, type, size etc.) has to be provided to perform the study accurately. Any missing data will be assumed and will not be responsible for any mis-calculation for lack of input data. Also, utility fault current need to be provided. This proposal is based on limited scope of 50 bus or less in the study. The scope and proposal will change significantly with increase of bus related to the study and will be re-negotiated before the start of the project.