Valve Reconstruction of 11 MW Water Turbine, Bulgaria

by Tabakov
Valve Reconstruction of 11 MW Water Turbine, Bulgaria
Valve Reconstruction of 11 MW Water Turbine, Bulgaria
Valve Reconstruction of 11 MW Water Turbine, Bulgaria
Valve Reconstruction of 11 MW Water Turbine, Bulgaria
Valve Reconstruction of 11 MW Water Turbine, Bulgaria

Modernization and reconstruction of 2 pc. spherical valves, including mechanical structure with new high pressure hydraulic system and PLC control. I was project manager of this reconstruction, including coordination and control of six contractors at the same time. Budget of reconstruction 140 000 Euro. Year of realization:2010 and 2011. I was designer of the mechanical reconstruction, preparing 3D model (with stress analyses) and 2D documentation - detail and assembly drawings. Preparing technical specification considering mechanical contractor - manufacturer of details. I was designer of new hydraulic scheme, including all calculations and technical specifications. Preparing technical specification considering hydraulic system contractor - manufacturer of the hydraulic unit. I was designer of algorithms for control system and PLC visualization.Preparing technical specification considering control system (electric part and automation) system contractor.

image of username Tabakov Flag of Bulgaria Rakovski, Bulgaria

About Me

Advanced designer with 12 years experience with 3D (Autodesk Inventor, SolidWorks) and 2D (Autocad, DraftSight) drawings. Design of mechanical and hydraulic equipment. Engineering calculations, technical writing, project management.

$10 USD/hr

NEW FREELANCER!

Tags