HV transmission line design projects
$10-30 USD
Paid on delivery
Preparing the preliminary studies , site visits ,drawings , specifications , feasibility
,the estimated cost of the projects and Designing of High Voltage transmission lines
using PLS-CADD including project design criteria, plan and profile drawings, and
loading drawings, assembly drawings in the field of OHTL in big projects such as
I. Mostakbal city1 / Babr 220Kv OHTL interconnection (El Mostakbal Company
for Development and Urban in Egypt).
II. Relocation of 500 ,220 and 66Kv OHTL(El Mostakbal Company for
Development and Urban in Egypt).
III. Relocation of 500 ,220 and 66Kv OHTL( Madinet Nasr Company for Housing
and Development in Egypt ).
IV. Relocation of 66 and 11Kv OHTL(Upscale Borj Al Arab in Egypt).
V. Mirama / Nsongezi 132Kv OHTL(UETCL in Uganda).
VI. Bulyanhulu / Geita 220Kv OHTL (TANESCO in Tanzania).
Project ID: #17936436